Unmanned and chimpanzee flights


The 20 unmanned flights used Little Joe, Redstone, and Atlas launch vehicles. They were used to develop the launch vehicles, launch escape system, spacecraft and tracking network. One flight of a Scout rocket attempted to launch a specialized satellite equipped with Mercury communications components for testing the ground tracking network, but the booster failed soon after liftoff. The Little Joe program used seven airframes for eight flights, of which three were successful. The second Little Joe flight was named Little Joe 6, because it was inserted into the program after the first 5 airframes had been allocated.

Mission Launch
(DD-MM-YYYY)
Duration Purpose Result
Mercury-Little-Joe 1
21-08-1959
20 sec
Test of launch escape system during flight.
Failure
Mercury-Big-Joe 1
09-09-1959
13 min
Test of heat shield and Atlas/spacecraft interface.
Partial success
Mercury-Little-Joe 6
04-10-1959
5 min
Test of spacecraft aerodynamics and integrity.
Partial success
Mercury-Little-Joe 1A
04-11-1959
8 min
Test of launch escape system during flight with boiler plate capsule.
Partial success
Mercury-Little-Joe 2
04-12-1959
11 min
Escape system test with primate at high altitude.
Success
Mercury-Little-Joe 1B
21-01-1960
8 min
Maximum-q abort and escape test with primate with boiler plate capsule.
Success
Mercury Beach Abort 1
09-05-1960
1 min 16 sec
Test of the off-the-pad abort system.
Success
Mercury-Atlas 1
29-07-1960
3 min
Test of spacecraft / Atlas combination.
Failure
Mercury-Little-Joe 5
08-11-1960
2 min
First Little Joe escape system test with a production spacecraft, at max-q.
Failure
Mercury-Redstone 1
21-11-1960
2 sec
Qualification of spacecraft / Redstone combination.
Failure
Mercury-Redstone 1A
12-12-1960
15 min
Qualification of spacecraft / Redstone combination.
Success
Mercury-Redstone 2
31-01-1961
15 min
Qualification of spacecraft with chimpanzee named Ham.
Success
Mercury-Atlas 2
21-02-1961
17 min
Qualified Mercury/Atlas interface.
Success
Mercury-Little-Joe 5A
18-03-1961
23 min
Second test of escape system with a production Mercury spacecraft.
Partial success
Mercury-Redstone BD
24-03-1961
8 min
Final Redstone test flight.
Success
Mercury-Atlas 3
25-04-1961
7 min
Orbital flight with robot astronaut.
Failure
Mercury-Little-Joe 5B
28-04-1961
5 min
Third test of escape system with a production spacecraft.
Success
Mercury-Atlas 4
13-09-1961
1 h 49 min
Test of environmental control system with robot astronaut in orbit.
Success
Mercury-Scout 1
01-11-1961
43 sec
Special satellite to test Mercury tracking network.
Failure
Mercury-Atlas 5
29-11-1961
3 h 20 min
Test of environmental control system in orbit with chimpanzee named Enos.
Success